Keeping the sand on Costa Teguise’s beaches until 2080
Improvement scheme for three urban beaches in Costa Teguise, Lanzarote: El Ancla, El Jablillo and Los Charcos. For the Cabildo of Lanzarote and La Graciosa.

The challenge
All three beaches are busy tourist beaches, with hotels and a promenade that depend on their condition. All are losing dry-beach sand, in places down to the rock platform, and their breakwaters must be adapted to the sea level expected over the design life of the works.
The solution
We work from our own data: drone LiDAR topobathymetry, multibeam bathymetry, a bionomic survey and 900 wave propagation runs. At El Ancla and Los Charcos we rebuild the breakwaters and nourish the beach at the same time, because one without the other doesn’t work. At El Jablillo, which already holds its sand, we reinstate the side rock armour and widen the beach.
The outcome
A single design with three schemes priced separately, so the Cabildo can tender them together or in lots without amending it. The works avoid the Cymodocea nodosa seagrass meadows and are scheduled outside the storm season.
- Project
- Costa Teguise beaches
- Client
- Cabildo de Lanzarote
- Location
- Teguise, Lanzarote (Canary Islands)
- Year
- 2026
- Service
- Detailed design
- Sector
- Maritime
- Key technical aspects
- Coastal processesLiDAR and bathymetryClimate changeRubble-mound breakwaters
What you don’t see
The aim isn’t just to add sand: it’s to create the conditions for it to stay.
That is why every option is measured against how much sand could escape through the harbour entrance.