MaritimeL’Estartit, Torroella de Montgrí (Girona) · 2021

Preparing L’Estartit harbour for the next thirty years

Detailed design and site supervision of the works for the new concession of L’Estartit marina, 0.6 miles from the Medes Islands Marine Reserve, for Club Nàutic Estartit.

Preparing L’Estartit harbour for the next thirty years
687
berths
58,591 m²
of land and water concession
30 years
new concession
0.6 miles
to the Medes Islands

The challenge

The 1973 concession expired in 2013. In 2014 the club signed a new 30-year contract with the Generalitat requiring it to modernise the harbour: the berths no longer suited today’s boats, there was a shortage of 10–12 m berths and too little land area for so much water.

The solution

We organised the works in two strands. Protection and shelter, to reduce agitation inside the basin. And better service: new quays and pontoons, climate adaptation by raising quays and pontoons, and the inner basin and clubhouse in phases. We prepared the detailed design and supervised construction.

The outcome

A harbour with berths for today’s boat lengths, ready for the sea level to come, and a new promenade along the Garbí breakwater taking residents and visitors out to the viewpoint.

Project
New concession for L’Estartit marina
Client
Club Nàutic Estartit
Location
L’Estartit, Torroella de Montgrí (Girona)
Year
2021
Service
Detailed design and site supervision
Sector
Maritime
Key technical aspects
MarinasPort concessionsClimate changeSite supervision

What you don’t see

Raising quays and pontoons doesn’t show in a photo, but it’s what will keep the harbour working as the sea rises.

More Maritime projects

See the sector →
Maritime2026 · Ports de la Generalitat

Dredging of the Vilanova i la Geltrú harbour entrance

Maritime2026 · Port Authority of Pasaia

Strengthening of the Buenavista quay

Maritime2026 · Cabildo de Lanzarote

Costa Teguise beaches