Preparing L’Estartit harbour for the next thirty years
Detailed design and site supervision of the works for the new concession of L’Estartit marina, 0.6 miles from the Medes Islands Marine Reserve, for Club Nàutic Estartit.

The challenge
The 1973 concession expired in 2013. In 2014 the club signed a new 30-year contract with the Generalitat requiring it to modernise the harbour: the berths no longer suited today’s boats, there was a shortage of 10–12 m berths and too little land area for so much water.
The solution
We organised the works in two strands. Protection and shelter, to reduce agitation inside the basin. And better service: new quays and pontoons, climate adaptation by raising quays and pontoons, and the inner basin and clubhouse in phases. We prepared the detailed design and supervised construction.
The outcome
A harbour with berths for today’s boat lengths, ready for the sea level to come, and a new promenade along the Garbí breakwater taking residents and visitors out to the viewpoint.
- Project
- New concession for L’Estartit marina
- Client
- Club Nàutic Estartit
- Location
- L’Estartit, Torroella de Montgrí (Girona)
- Year
- 2021
- Service
- Detailed design and site supervision
- Sector
- Maritime
- Key technical aspects
- MarinasPort concessionsClimate changeSite supervision