Strengthening the Buenavista quay at Pasaia port without stopping operations
Strengthening of two structures on the Buenavista quay at Pasaia port: the bays between bollards 29 and 31, built in 1974, and the culvert over the last stretch of the Molinao stream. From initial study to detailed design, for the Port Authority of Pasaia.

The challenge
A 2023 underwater inspection found defects and structural shortcomings in the quay. The structures were designed for lighter loads than today’s cranes and equipment, in an aggressive marine environment and in a port that cannot stop.
The solution
We worked in four stages: underwater inspection, detailed survey and ground investigation; structural assessment; two options per zone under ROM loading; and detailed design. At the Molinao stream we replaced the beams with precast post-tensioned I-beams on new bearing beams, with abutments strengthened by micropiles. Between bollards 29 and 31 we closed the front with an anchored submerged wall, filled the voids with recycled concrete aggregate and built a new quay-edge beam on 120 cm piles socketed into rock.
The outcome
A quay ready for today’s operating loads, with four new 75 t bollards, new fenders, renewed drainage and an upgraded power supply.
- Project
- Strengthening of the Buenavista quay
- Client
- Port Authority of Pasaia
- Location
- Pasaia (Gipuzkoa)
- Year
- 2026
- Service
- Detailed design
- Sector
- Maritime
- Key technical aspects
- Maritime structuresUnderwater inspectionPiles and micropilesROM recommendations
What you don’t see
The new quay-edge beam houses a 2 × 2 m services gallery and a recess for a future crane rail.
The quay is ready for what lies ahead, without having to open it up again.