Ending untreated wastewater discharges in Fontanelles
Options appraisal and detailed design of the sewerage and treatment plant for Fontanelles, in Muntanyola (Osona). Lot 1 of the Consell Comarcal d’Osona tender, awarded to Enigest in 2024.

The challenge
Fontanelles had no wastewater treatment: sewage reached two streams. It is a second-home neighbourhood that grows from about 224 residents to over 330 in season, with planning capacity for 660.
The solution
We measure before we size: a sampling campaign in July 2024, on weekdays and holidays. We compared three technologies and chose rotating biological contactors, the most robust to changes in temperature and flow. The 901 m sewer runs by gravity under the street, with no pumping at all.
The outcome
A treatment plant for 350 population equivalent, with the site ready to grow to 700, effluent BOD5 < 25 mg/l, SS < 35 mg/l y DQO < 125 mg/l, canal de biorremediación y placas fotovoltaicas.
- Project
- Fontanelles sewerage and WWTP
- Client
- Consell Comarcal d'Osona
- Location
- Fontanelles, Muntanyola (Barcelona)
- Year
- 2024
- Service
- Detailed design
- Sector
- Water
- Key technical aspects
- Rotating biological contactorsSampling campaignGravity networksSolar energy
What you don’t see
Before drawing a single pipe we surveyed 1,200 m of street and the 16 existing manholes, and sampled for two weeks.
The design starts from what actually flows through the network.