A kilometre of pipe so a water treatment plant can retire its septic tank
Design for connecting the Torrent drinking water plant to the Pals sewerage system, for the Consorci d’Aigües Costa Brava Girona.

The challenge
The drinking water plant, far from any town, treated its own wastewater with a septic tank and soakaway. With staff numbers rising from 8 to 20 at peak times, the interim solution — a sealed tank emptied by tanker — could not be the permanent one.
The solution
A pumping well at the plant and a 988 m rising main, buried under the track alongside the Riera Grossa de Llofriu, to a manhole on the Torrent–Pals sewer. From there, flows reach the Pals treatment plant by gravity.
The outcome
The plant does away with the septic tank and the tankers: its wastewater is treated at the plant, just like the town’s.
- Project
- Pumping and connection of the Torrent–Pals water treatment plant
- Client
- Consorci d'Aigües de la Costa Brava
- Location
- Torrent and Pals (Girona)
- Year
- 2024
- Service
- Detailed design
- Sector
- Water
- Key technical aspects
- SeweragePumping stationsRising mainsConnection to the existing network
What you don’t see