Public sectorPrivate sector ES · CA · EN
Enigest
WaterTorrent and Pals (Girona) · 2024

A kilometre of pipe so a water treatment plant can retire its septic tank

Design for connecting the Torrent drinking water plant to the Pals sewerage system, for the Consorci d’Aigües Costa Brava Girona.

A kilometre of pipe so a water treatment plant can retire its septic tank
988 m
of rising main
8 → 20
staff at the plant at peak times
2.7 m³
design daily flow
1
pumping well with valve chamber

The challenge

The drinking water plant, far from any town, treated its own wastewater with a septic tank and soakaway. With staff numbers rising from 8 to 20 at peak times, the interim solution — a sealed tank emptied by tanker — could not be the permanent one.

The solution

A pumping well at the plant and a 988 m rising main, buried under the track alongside the Riera Grossa de Llofriu, to a manhole on the Torrent–Pals sewer. From there, flows reach the Pals treatment plant by gravity.

The outcome

The plant does away with the septic tank and the tankers: its wastewater is treated at the plant, just like the town’s.

Project
Pumping and connection of the Torrent–Pals water treatment plant
Client
Consorci d'Aigües de la Costa Brava
Location
Torrent and Pals (Girona)
Year
2024
Service
Detailed design
Sector
Water
Key technical aspects
SeweragePumping stationsRising mainsConnection to the existing network

What you don’t see

The whole route runs under an existing track beside the stream: the pipe opens no new trench across the fields.

More Water projects

See the sector →
Water2024 · Consell Comarcal d'Osona

Fontanelles sewerage and WWTP

Water2025 · Aigües Ter Llobregat (ATL)

Connecting La Llagosta to the Ter-Llobregat network

Water2026 · EMACSA

Storm tanks in Córdoba