MaritimeVilanova i la Geltrú (Barcelona) · 2026

Restoring the depth of the Vilanova i la Geltrú harbour entrance after Storm Nelson

Multi-year maintenance dredging design for the harbour entrance and approach channel, under Ports de la Generalitat’s 2024–2027 Investment Plan.

Restoring the depth of the Vilanova i la Geltrú harbour entrance after Storm Nelson
112,336 m³
of sediment to dredge
95,859 m²
of area
12
samples characterised
Category A
all material

The challenge

In spring 2024 Storm Nelson left a tongue of sand across the harbour entrance. Depth fell to the point of compromising access for the larger vessels, and the hazard had to be marked with temporary buoys.

The solution

We calculated the volume from bathymetry and design depths and characterised the sediment with 12 samples following CEDEX guidelines. All of it is category A. We separated clean sand from fines: 96,310 m³ can go to eroding beaches and 16,026 m³ to the authorised disposal area.

The outcome

A design ready to be carried out in 2026 and 2027, with an environmental monitoring plan: turbidity curtains, weekly water and sediment monitoring and monthly reports.

Project
Dredging of the Vilanova i la Geltrú harbour entrance
Client
Ports de la Generalitat
Location
Vilanova i la Geltrú (Barcelona)
Year
2026
Service
Dredging design and environmental monitoring
Sector
Maritime
Key technical aspects
BathymetrySediment characterisationCoastal managementEnvironmental monitoring

What you don’t see

The sand blocking the harbour is used to replenish neighbouring beaches the sea is eroding.

More Maritime projects

See the sector →
Maritime2026 · Port Authority of Pasaia

Strengthening of the Buenavista quay

Maritime2021 · Club Nàutic Estartit

New concession for L’Estartit marina

Maritime2026 · Cabildo de Lanzarote

Costa Teguise beaches