Restoring the depth of the Vilanova i la Geltrú harbour entrance after Storm Nelson
Multi-year maintenance dredging design for the harbour entrance and approach channel, under Ports de la Generalitat’s 2024–2027 Investment Plan.

The challenge
In spring 2024 Storm Nelson left a tongue of sand across the harbour entrance. Depth fell to the point of compromising access for the larger vessels, and the hazard had to be marked with temporary buoys.
The solution
We calculated the volume from bathymetry and design depths and characterised the sediment with 12 samples following CEDEX guidelines. All of it is category A. We separated clean sand from fines: 96,310 m³ can go to eroding beaches and 16,026 m³ to the authorised disposal area.
The outcome
A design ready to be carried out in 2026 and 2027, with an environmental monitoring plan: turbidity curtains, weekly water and sediment monitoring and monthly reports.
- Project
- Dredging of the Vilanova i la Geltrú harbour entrance
- Client
- Ports de la Generalitat
- Location
- Vilanova i la Geltrú (Barcelona)
- Year
- 2026
- Service
- Dredging design and environmental monitoring
- Sector
- Maritime
- Key technical aspects
- BathymetrySediment characterisationCoastal managementEnvironmental monitoring