Repairing a 1960 bridge over a live railway
Repair design for the old GI-633 road bridge over the Barcelona–Girona railway in Riudellots de la Selva, following a request from ADIF.

The challenge
ADIF asked the town council to inspect the bridges over the railway. On the old GI-633 bridge, water was getting in through cracks, corroding the reinforcement and spalling the concrete cover of the beams, right above the overhead line.
The solution
Starting from the damage survey, we designed the repair of the main and secondary beams and the deck, the treatment of damp in the deck and abutments, the extension of the vehicle restraint system, anti-vandal protection and protection of the overhead line.
The outcome
A bridge with protected reinforcement and no spalling over the track: safer for trains and longer-lasting.
- Project
- Repair of the old GI-633 bridge over the railway
- Client
- Ajuntament de Riudellots de la Selva
- Location
- Riudellots de la Selva (Girona)
- Year
- 2025
- Service
- Repair design
- Sector
- Transport & Cities
- Key technical aspects
- Structural assessmentConcrete repairBridgesRailway environment
What you don’t see



