Linking the two banks of the Flamisell with 78 metres of precast footbridge
A footbridge between Passeig 1 d’Octubre and Parc dels Raiers in La Pobla de Segur, a few metres from where the Flamisell meets the Noguera Pallaresa.

The challenge
Linking two riverbanks for pedestrians with a structure able to withstand the floods of a mountain river and fit into protected undevelopable land.
The solution
A 78 m deck made of four precast post-tensioned double-tee beams, 3 m wide: two of 22 m and two of 17 m. We chose those lengths so the beams could travel by road from the precast yard without abnormal loads. They sit on abutments and piers founded to resist scour.
The outcome
A complete detailed design, with hydraulic, geotechnical, archaeological, environmental and landscape studies, designed to be erected in three months with minimal work in the river channel.
- Project
- Footbridge over the River Flamisell
- Client
- Ajuntament de la Pobla de Segur
- Location
- La Pobla de Segur (Lleida)
- Year
- 2025
- Service
- Detailed design
- Sector
- Transport & Cities
- Key technical aspects
- Post-tensioned concretePrefabricationRiver hydraulicsLandscape integration
What you don’t see
The deck soffit sits at level 509.82 m.
It sits half a metre above the 500-year flood level, the freeboard recommended by the Catalan Water Agency.