MaritimeLloret de Mar (Girona) · 2025

Ten more years of concession, with a higher breakwater

Outline design of the works tied to the ten-year extension of the Cala Canyelles marina concession in Lloret de Mar, for Club Nàutic Cala Canyelles.

Ten more years of concession, with a higher breakwater
10 years
concession extension
+4.30 m
new crown wall level
6–8 t
roundhead armour
18 → 26
8 m berths

The challenge

To extend the concession, the port authority requires investment. And the fleet has changed: boats are longer and wider than the old berths.

The solution

We raise the breakwater’s rock armour and lift the concrete crown wall by a metre, to +4.30; we strengthen the roundhead with 6–8 t armour stone and reorganise the berths with wider minimum beams. All in line with the Horizon 2030 Ports Plan.

The outcome

Less agitation in the basin, safer mooring in storms and berths sized for today’s boats.

Project
Extension of the Cala Canyelles concession
Client
Club Nàutic Cala Canyelles
Location
Lloret de Mar (Girona)
Year
2025
Service
Outline design
Sector
Maritime
Key technical aspects
Rubble-mound breakwatersPort concessionsBerth layoutClimate change adaptation

What you don’t see

Fourteen berths are given up on purpose: fewer places, but the ones left suit the boats that actually need them.

More Maritime projects

See the sector →
Maritime2026 · Ports de la Generalitat

Dredging of the Vilanova i la Geltrú harbour entrance

Maritime2026 · Port Authority of Pasaia

Strengthening of the Buenavista quay

Maritime2021 · Club Nàutic Estartit

New concession for L’Estartit marina