Two plants against drought for the northern Costa Brava’s water
Detailed design and site supervision of an ultrafiltration plant and a reverse osmosis plant in Empuriabrava, for the Consorci d’Aigües Costa Brava Girona, at the height of the 2023–2024 drought.

The challenge
The Darnius-Boadella reservoir fell to 14 %, and the Empuriabrava drinking water plant, which supplies Roses, Castelló d’Empúries, Llançà, El Port de la Selva and La Selva de Mar, was receiving water from the Muga with ever more organic matter. More water, of better quality, was needed — fast.
The solution
Two containerised plants on concrete slabs. The four-container ultrafiltration plant, with a 350 m³/h inflow, cleans the water before it reaches the drinking water treatment plant. The reverse osmosis plant is fed by five new wells in the Parc del Trabuc and produces 180 m³/h at 90 % recovery.
The outcome
The ultrafiltration plant was built between June 2024 and February 2025, and the reverse osmosis plant between February and March 2025. More water, of better quality, for the northern Costa Brava.
- Project
- Ultrafiltration and reverse osmosis in Empuriabrava
- Client
- Consorci d’Aigües Costa Brava Girona
- Location
- Castelló d’Empúries (Girona)
- Year
- 2025
- Service
- Detailed design and site supervision
- Sector
- Industrial
- Key technical aspects
- UltrafiltrationReverse osmosisContainerised plantsSite supervision