Public sectorPrivate sector ES · CA · EN
Enigest
IndustrialLleida · 2023

Bringing Hall 5 at Fira de Lleida up to date so it could be built

Consolidated outline and detailed design of the new Hall 5 at Fira de Lleida and its surroundings, building on the 2012 and 2022 designs, for Fundació Fira de Lleida.

Bringing Hall 5 at Fira de Lleida up to date so it could be built
4,618 m²
hall footprint
934 m²
link building
2,911 m²
of external works
11 months
construction period

The challenge

The 2012 design and its 2022 amendment were not enough to build from: the permitted use did not cover public events, and the quantities had gaps that could lead to disputes on site.

The solution

A complete, unified design that extends the exhibition use to public events, upgrades services for energy efficiency, communications and safety, and reviews every quantity, while respecting the structure and authorship of the earlier designs. The hall is a twin of Hall 4, and a central block lets them be used together or separately.

The outcome

A design ready for planning consent and tender, with the hall and external works built together.

Project
Hall 5 at Fira de Lleida
Client
Fundació Fira de Lleida
Location
Lleida
Year
2023
Service
Consolidated outline and detailed design
Sector
Industrial
Key technical aspects
BuildingsBuilding servicesFire protectionEnergy efficiency

What you don’t see

The water tanks and eight HVAC units go up onto the roof of the link building, and the service trench covers are rated for heavy vehicles.

More Industrial projects

See the sector →
Industrial2025 · Consorci d’Aigües Costa Brava Girona

Ultrafiltration and reverse osmosis in Empuriabrava

Industrial2024 · Private client

Extension of a paper mill pulp line in Mexico

Industrial2026 · Barcelona Metropolitan Area (AMB)

Green roof renewal at Ecoparc 3