A 9,170 m² green roof that stops leaking — without stopping the plant

Investigation of leaks in the green roof of Ecoparc 3 in Sant Adrià de Besòs, a metropolitan waste treatment plant, and design of the emergency works and permanent solution, for the Barcelona Metropolitan Area.

A 9,170 m² green roof that stops leaking — without stopping the plant
9,170 m²
of green roof
825 kWp
of solar PV retained
−32 kg/m²
of load on the structure
79/100
score of the preferred option

The challenge

Since 2024 water had been getting into the pre-treatment hall, electrical rooms, weighbridge and offices, and in December 2025 heavy rain damaged the control room. The PVC membrane was twenty years old, the laps had come apart and the profiled steel deck underneath was corroding under trapped water. All above a plant that treats waste every day of the year.

The solution

We identified five leakage mechanisms and ranked them by strength of evidence. We compared four options and five waterproofing systems through a multi-criteria analysis. The preferred option strips the roof back to the deck, repairs it, adds rock wool insulation and a mechanically fixed, root-resistant TPO membrane welded without a flame, installs 16 new outlets and 6 overflows, and reinstates the green roof and the 1,738 solar panels. Works run in three phases, with each sector made watertight before the next is opened.

The outcome

A green roof that stays watertight for at least fifteen years, keeps its solar array and weighs less than before: the new build-up takes about 32 kg/m² off the structure.

Project
Green roof renewal at Ecoparc 3
Client
Barcelona Metropolitan Area (AMB)
Location
Sant Adrià de Besòs (Barcelona)
Year
2026
Service
Diagnosis, emergency works and design
Sector
Industrial
Key technical aspects
Defect diagnosisGreen roofsWaterproofingLive plant

What you don’t see

Not a single naked flame on site: at a waste plant, the membrane is hot-air welded.

More Industrial projects

See the sector →
Industrial2025 · Consorci d’Aigües Costa Brava Girona

Ultrafiltration and reverse osmosis in Empuriabrava

Industrial2024 · Private client

Extension of a paper mill pulp line in Mexico

Industrial2023 · Fundació Fira de Lleida

Hall 5 at Fira de Lleida