Bot’s first wastewater treatment plant, in the Terra Alta
Site supervision of the sewerage and new wastewater treatment plant for Bot (Terra Alta), for the Catalan Water Agency. Part of the programme of measures of the Ebro River Basin Plan.

The challenge
Bot discharged its untreated wastewater at a single point, the Toll de Picapalles, next to the Gandesa river. A village of about 600 people with seasonal swings of around 50 %, and wineries that push up the pollutant load.
The solution
A 174 m sewer carries all flows by gravity to the new plant, with no pumping. The plant has 1 mm screening, a lamella settler, a biological reactor with concentric clarifier, a sludge thickener and a control building. As site supervisors, we follow every stage so it is built on time, on budget and to the quality of the design.
The outcome
Treated water that meets the EU Urban Wastewater Directive: BOD5 below 25 mg/l and COD below 125 mg/l.
- Project
- Bot sewerage and WWTP
- Client
- Agència Catalana de l’Aigua
- Location
- Bot, Terra Alta (Tarragona)
- Year
- 2026
- Service
- Site supervision
- Sector
- Water
- Key technical aspects
- Site supervisionBiological treatmentGravity networksWater with industrial load
What you don’t see
Sampling detected very high BOD5, from wine production at the local wineries.
That is why a lamella settler upstream of the biological stage cuts the load reaching the reactor.