EnvironmentMonistrol de Montserrat (Barcelona) · 2026

Channelling two mountain streams behind Montserrat Abbey

Detailed design for channelling the Trinitat and Sant Salvador streams upstream of Montserrat Abbey, for the Catalan Water Agency (ACA).

Aerial view of Montserrat monastery showing the route of the Trinitat and Sant Salvador torrent channels
Project visualisation · 1 Trinitat stream intake · 2 Sant Salvador stream intake · 3 Connection to the Santa Maria stream channel
Designed channel (shown see-through where it runs beneath buildings and roads) · Torrent flow · Upper catchment of the Santa Maria torrent
10 m³/s
design flow (500-year return period)
302 m
of conduits
2
intake structures with debris retention
0
heritage elements affected

The challenge

The Trinitat and Sant Salvador streams drop from a considerable height behind the abbey and the Hostal Vell. In heavy rain the water runs across the squares, carries debris down the mountain and deposits it between the Portal de la Muralla and the rack-railway station. All of this within a natural park, with the site open to visitors.

The solution

Two reinforced-concrete intake structures retain debris and attenuate the flow. From there the water runs through galvanised steel pipes anchored to the rock face and a widened channel along the mountain, then underground through 1,400 mm HDPE pipes and 2 × 1.5 m and 2 × 2 m precast box culverts into the existing Santa Maria stream channel, which was already sized to take this flow.

The outcome

The abbey’s streets are no longer at risk of flooding in the 500-year flood, and access to the basilica, hotel and museum is maintained throughout the works.

Project
Channelling of the Trinitat and Sant Salvador streams at Montserrat
Client
Agència Catalana de l’Aigua
Location
Monistrol de Montserrat (Barcelona)
Year
2026
Service
Detailed design
Sector
Environment
Key technical aspects
Mountain stream hydraulicsIntake structuresDebris retentionProtected natural area

What you don’t see

Where machinery cannot reach, the design accounts for it too: hand-held breakers for demolition, barrows for waste removal and slabs poured in two stages so as not to overload the existing roofs.

More Environment projects

See the sector →
Environment2024 · Ajuntament de Santa Eulàlia de Ronçana

Flood protection on the River Tenes

Environment2026 · Barcelona Metropolitan Area (AMB)

Channel and lagoons at the mouth of the Besòs

Environment2025 · Infraestructures.cat

Noise protection on the C-12 at Roquetes and Tortosa