Upgrading a water treatment plant without cutting off two towns
Design and site supervision of the upgrade of the drinking water treatment plant that supplies Ripoll and Campdevànol, for SOMARSA.

The challenge
Upgrading a plant in service, with run-down buildings, asbestos-cement pipework, an unstable slope next to the chemicals area and a high-voltage line that limits where anything can be built.
The solution
We reworked the site layout: arsenic treatment is integrated into the filtration building, the chemicals building is enlarged and moved away from the slope, and the office and laboratory are rebuilt. We renewed the filtration with 250 m³/h, 6 bar pressure filters, removed the asbestos-cement pipework and improved flow collection in the settling tanks and the intake from the Guarro-Casas canal.
The outcome
More reliable treated water for both towns, automatic backwashing, lower simultaneous power demand and a well-ordered plant for decades to come.
- Project
- Upgrade of the Ripoll and Campdevànol water treatment plant
- Client
- SOMARSA
- Location
- Ripoll and Campdevànol (Girona)
- Year
- 2027
- Service
- Design and site supervision
- Sector
- Water
- Key technical aspects
- Drinking water treatmentArsenic removalPressure filtrationSite supervision